Bitcoin Miner S19 XP Hyd.
| Function | BTC/BCH/BSV SHA256 Hydro-cooling Miner |
| Specifications | 257T 5346W 20.8J/T |
| Price |
9 $/T
2,313 $/Unit
|
- Categories: Bitcoin Miner, BTC/BCH/BSV
- Availability: In Stock
- Product Type: Simple
Performance Curves
1. Hashrate vs. Inlet Coolant Temperature
2. Power Efficiency vs. Inlet Coolant Temperature
(1-1) The hashrate value, and power efficiency on wall are all typical values. The actual hashrate value fluctuates by ±3%, and the actual power efficiency on wall fluctuate by ±5%.
| Specifications
| Product Glance | Value |
| Model | S19 XP Hyd. |
| Crypto algorithm/coins | SHA256 | BTC/BCH/BSV |
| Typical hashrate, TH/s(2-1) | 257 |
| Power on wall @35°C(2-2), Watt(2-1) | 5346 |
| Power efficiency on wall @35°C(2-2), J/T(2-1) | 20.8 |
| Detailed Characteristics | Value | |
| Power supply | ||
| Phase | 3 | |
| Input voltage, Volt(3-1) | 380~415 | |
| Input frequency range, Hz | 50~60 | |
| Input max current, Amp | 12 | |
| Hardware Configuration | ||
| Network connection mode | RJ45 Ethernet 10/100M | |
| Server size (length*width*height, w/o package), mm | 410*170*209 | |
| Server size (length*width*height, with package), mm | 570*316*430 | |
| Net weight, kg | 12.8 | |
| Gross weight, kg | 14.1 | |
| Environment Requirements | ||
| Inlet coolant temperature, ℃ | 20~40 | |
| Coolant flow, L/min | 8.0~10.0 | |
| Coolant pressure, bar | ≤3.5 | |
| Working coolant(3-2) | Antifreeze/ Pure water/Deionized water | |
| Coolant pH value |
Antifreeze: 7.0~9.0
Pure water: 6.5~7.5
Deionized wate: 8.5~9.5
|
|
| Diameter of coolant pipe connector, mm | OD10 | |
| Storage temperature, °C | -20~70 | |
| Operation humidity(non-condensing), RH | 10%~90% | |
Notes:
(2-1) The hashrate value, power on wall, and power efficiency on wall are all typical values. The actual hashrate value fluctuates by ±3%, and the actual Power on wall and Power efficiency on wall fluctuate by ±5%.
(2-2) Inlet water temperature.
(3-1) Caution: Wrong input voltage may cause server damaged.
(3-2) For detailed working coolant use and maintenance instructions, please refer to “ANTSPACE HK3 Water Cooling Container & Dry-Wet Tower Product Manual”, Chapter 9, Article 3, Point 6, “Maintenance of Coolant”!
1. Hashrate vs. Inlet Coolant Temperature
2. Power Efficiency vs. Inlet Coolant Temperature
(1-1) The hashrate value, and power efficiency on wall are all typical values. The actual hashrate value fluctuates by ±3%, and the actual power efficiency on wall fluctuate by ±5%.
| Product Glance | Value |
| Model | S19 XP Hyd. |
| Crypto algorithm/coins | SHA256 | BTC/BCH/BSV |
| Typical hashrate, TH/s(2-1) | 257 |
| Power on wall @35°C(2-2), Watt(2-1) | 5346 |
| Power efficiency on wall @35°C(2-2), J/T(2-1) | 20.8 |
| Detailed Characteristics | Value | |
| Power supply | ||
| Phase | 3 | |
| Input voltage, Volt(3-1) | 380~415 | |
| Input frequency range, Hz | 50~60 | |
| Input max current, Amp | 12 | |
| Hardware Configuration | ||
| Network connection mode | RJ45 Ethernet 10/100M | |
| Server size (length*width*height, w/o package), mm | 410*170*209 | |
| Server size (length*width*height, with package), mm | 570*316*430 | |
| Net weight, kg | 12.8 | |
| Gross weight, kg | 14.1 | |
| Environment Requirements | ||
| Inlet coolant temperature, ℃ | 20~40 | |
| Coolant flow, L/min | 8.0~10.0 | |
| Coolant pressure, bar | ≤3.5 | |
| Working coolant(3-2) | Antifreeze/ Pure water/Deionized water | |
| Coolant pH value |
Antifreeze: 7.0~9.0
Pure water: 6.5~7.5
Deionized wate: 8.5~9.5 |
|
| Diameter of coolant pipe connector, mm | OD10 | |
| Storage temperature, °C | -20~70 | |
| Operation humidity(non-condensing), RH | 10%~90% | |

Be the first to review “Bitcoin Miner S19 XP Hyd.”
Compare similar items
|
|
|
|
|
|||||||||||||||||||||
|
Find and select products to see the differences and similarities between them |
||||||||||||||||||||||||
| Customer Rating |
|
|
|
|
||||||||||||||||||||
| Price |
$2313.00 |
$7740.00 |
$180000.00 |
$16000.00 |
||||||||||||||||||||
| Item Dimensions |
N/A
|
N/A
|
N/A
|
N/A
|
||||||||||||||||||||
| Special Features |
Shipping Date
Shipping in February-March
Payment Method
USDBTCETCUSDT(ERC20/TRC20)
|
Shipping Date
SPOT Shipping from October 2026
Payment Method
USDBTCETCUSDC(ERC20)USDT(ERC20/TRC20
|
Shipping Date
SPOT Shipping in 60 working days after fully paid
Payment Method
USDBTCETCUSDT(ERC20/TRC20)
|
Shipping Date
SPOT Shipping from November 2026
Payment Method
USDBTCETCUSDC(ERC20)USDT(ERC20/TRC20)
|
||||||||||||||||||||
| Weight |
N/A
|
N/A
|
N/A
|
N/A
|
||||||||||||||||||||
| Availability |
In stock |
In stock |
In stock |
In stock |

